Temporary Production Floaters for 1st & 2nd Shift

by LaMotte in

Job role overview

  • Date posted

    May 7, 2026

  • Hiring location

    Chestertown

Description

Temporary Production Floaters For 1st & 2nd Shift

Assembles test kits and test strips. Fills in for other production positions as needed. Should be well organized with a good attention to detail. Must be dependable; be able to work independently; have good color perception. Must be able to transport up to 40 pounds. 1st shift hrs. are 7:00 a.m. to 3:45 p.m., Monday through Friday, with overtime as needed. 2nd shift hrs. are 3:45 p.m. to 12:30 a.m., Monday through Friday with overtime as needed.

work mode

On-site

Interested in this job?

23 days left to apply

Apply now

Call employer
Apply now
Send message
Cancel