Temporary Production Floaters for 1st & 2nd Shift
by LaMotte
in
Job role overview
-
Date posted
May 7, 2026
-
Hiring location
Chestertown
Description
Temporary Production Floaters For 1st & 2nd Shift
Assembles test kits and test strips. Fills in for other production positions as needed. Should be well organized with a good attention to detail. Must be dependable; be able to work independently; have good color perception. Must be able to transport up to 40 pounds. 1st shift hrs. are 7:00 a.m. to 3:45 p.m., Monday through Friday, with overtime as needed. 2nd shift hrs. are 3:45 p.m. to 12:30 a.m., Monday through Friday with overtime as needed.
work mode
On-site
Interested in this job?
23 days left to apply