Job role overview

  • Date posted

    May 7, 2026

  • Hiring location

    Bethel

Description

SUMMARY
Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.

PERFORMANCE RESPONSIBILITIES

Study individual job sites, plan work and accurately take off construction material

Estimate amount of work and time required for job

Experience building foundations and leveling buildings.

Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing.

Manage materials and supplies as necessary to facilitate the efficient progression of work on the job.

Understand construction logistics in Rural Alaska.

Prepare project labor coding on timesheets

Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees.

Interact with the general public maintaining a professional attitude and working relationship.

Travels frequently within the region for projects.

Requirements
QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.

REQUIREMENTS

Supervisory Experience: Proof (evidence) of construction supervisory experience – minimum 4 years experience.

Provide resume of previous employment with references.

Show proficiency with residential construction.

EDUCATION and EXPERIENCE
Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it.

Certificates, Licenses, Registrations
Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy.

#J-18808-Ljbffr

work mode

On-site

Interested in this job?

23 days left to apply

Apply now

Call employer
Apply now
Send message
Cancel